HEARTH AI

Agentic construction site management for general contractors

Turn worksite images and videos into automated planning.

The problem

Site photos are stuck in camera rolls

Photos and videos of the site pile up in camera rolls and group chats — no location, no element, no analysis. What happened on site today gets typed into the schedule and the projections by hand, days later.

On site · what gets captured
Camera roll · Thu Aug 27184 items
IMG_4811
IMG_48120:42
IMG_4813
IMG_4814
IMG_48152:07
IMG_4816
IMG_4817
IMG_4818
IMG_4819
+174
Site group chat
L3 duct done? Need it for the owner update.
mostly. 3B still open, hangers not in yet. will send pics
No location, no element, no date against the plan. The evidence exists — nobody has time to go through 184 of them.
Manual updates
done through photos,
texts, and spreadsheets
In the office
Master schedule · Level 3 MEPlast updated Fri Aug 21
Activity
Aug 17Aug 24Aug 31Sep 7
% done
Duct mains 3A–3D
70%
Hydronic piping
40%
Sprinkler rough-in
40%
Drywall mobilize
Projection · owner report
L3 MEP rough-in complete
Sep 4
per schedule
Reported progress
~60%
self-reported, Fri
Typed in from memory, after the fact. The projection is only as true as the last update — and the last update was a week ago.
Site photos: MTA Capital Construction Mega Projects via Wikimedia Commons, CC BY 2.0 — illustrative, not a Hearth project.
The solution

Capture the site. Hearth does the rest.

Film the site however you already do. Hearth reads the capture, keeps the schedule and the projections current, and updates BIM and other 3D models.

01 · Reality capture

Plug Hearth into your existing reality capture solution or use our cameras

Phone walksA ten-minute walk on the phone a super already carries.
Hardhat and 360 camerasClip-on units, or the 360 rig you already own.
DronesExterior and structure flights — photos, point clouds, splats.
Fixed site camerasMast or ceiling mounted, one per active zone. Nobody walks it.
Already on OpenSpace or Track3D? We consume that capture too — we never compete with it.
02 · Analysis → automated schedules and projections

Hearth analyzes the images, updates the schedule, and flags delays, deviations, and safety concerns.

duct main · 0.97 hanger ×4 · 0.93 hydronic run · 0.95 sprinkler branch · 0.88 L3 · grid 4–6 · 06:40
What changed this morning
ScheduleDuct mains 3A–3D verified +4d behind. Drywall re-sequenced to 3A / 3C first.
ProjectionL3 MEP rough-in complete Sep 4 Sep 9 — from what is verified, not reported.
Anything under 0.85 confidence goes to a person, never silently into the plan.
03 · The model, kept current

Hearth updates the BIM model to match the reality

Duct mains 34/34
installed
Hangers 72/72
installed
Hydronic runs 20/28
in progress
Sprinkler 11/19
deviation
3A96%
3B61%
3Cactive
3D
DEV-114 — duct main 3B-07 sits 90 mm below model elevation. Flagged on the element.
342 / 418 elements verified on Level 3 — every one traceable to a frame.
Hearth proposes. Your superintendent releases.
Sample project.
The user interface

One system. Two views.

The site manager plans and releases from a desktop. Each crew gets its day on a phone — and closes it out with a photo.

HEARTHMeridian Yards — Bldg B · Level 3
Capture 06:40 todayRK
Timeline
This week
Today
Crews
Records
Level 3 MEP rough-in is 4–5 days behind plan.Drywall mobilizes Fri Aug 28 — zones 3B and 3D will not be ready. Hearth proposes resequencing drywall to 3A / 3C first.
Timeline · plan vs verified
Duct mains 3A–3D+4d
Hydronic piping+5d
Sprinkler rough-in+5d
Electrical conduit+4d
This week · released vs proposed
MON 2466 done
TUE 2575 done · 2 slipped
WED 2666 done
THU 275awaiting release
FRI 284provisional
Green is verified by capture, not self-reported.
Today · Thu Aug 275 proposed · 1 held
IWP-3C-09126.5 h
Hang duct mains — Zone 3C, grid 4–6 Sheet metal — Alvarez ×4
Approve & release
Edit
IWP-3B-09164 h
Rework duct main 3B-07 to model elevation From deviation DEV-114 · PE approved fix
Approve & release
Edit
IWP-3D-0920HELD
Core-drill hydronic sleeves — Zone 3D Slab cure 72 h — pour verified 08/25. Eligible Fri; Hearth re-proposes when the cure clears.
Hearth proposes the day. Nothing reaches a crew until the superintendent releases it.
Site manager · desktop
HEARTHBldg B · L3
Thu, Aug 27
Alvarez crew · released 05:52 by R. Kowalski
IWP-3C-0912UP NOW
Hang duct mains — Zone 3C, grid 4–6
Zone ready — verified this morning
Material: laydown bay 2 · 14 sticks
Done — take closeout photo
IWP-3B-0916NEXT
Rework duct main 3B-07 to elevation PE-approved fix · deviation DEV-114
Tomorrow · Fri Aug 28
Duct mains — Zone 3A, grid 1–3Provisional — confirms after tonight's capture
Crew · phone
Partner with us

Test it on one project, or one crew.

We offer tailored solutions to general contractors and developers.

We offer hands-on support on your AI transition journey.

We reply to every message. No newsletter, no list — this goes straight to the founders.